Willow Springs Distribution Watermain

Willow Springs Distribution Watermain

Cossill & Webley played a key role in the Willow Springs Distribution Watermain project, an essential infrastructure development located in Rockbank, Victoria. The scope of the project involved the installation of approximately 600 metres of 600mm diameter steel distribution water mains through an existing road reserve along Greigs Road. This critical upgrade provides water supply to Willow Springs estate and extends key infrastructure needed to support ongoing growth in Melbourne’s western growth corridor including the future Rockbank South Precinct Structure Plan.

A standout feature of the project was the safe and carefully managed construction within a highly constrained service corridor, navigating around a range of existing utilities.

Cossill & Webley were engaged for project management, detailed design, and construction supervision, ensuring successful delivery through all stages of the project lifecycle.