As part of the Alkimos Seawater Desalination Plant, Water Corporation is delivering an adjacent groundwater treatment plant to further strengthen Perth’s water supply and support the cities long-term resilience to climate change.

Together, the desalination and groundwater treatment plants will ultimately supply up to two-thirds of Perth’s potable water. The broader project includes a network of groundwater abstraction bores and bore collector mains.

Cossill & Webley prepared the design for 2600 metres of bore collector main along Marmion Avenue, the future Alkimos Drive corridor and within the Alkimos Vista Estate. The design responded to a number of complex interface and environmental constraints, including:

  • Crossing over the Yanchep Rail Extension
  • Coordination with trunk service alignments in Alkimos Drive and Marmion Avenue
  • Coordination with the developer at Alkimos Vista to agree the bore main location within future road reserves with consideration of future services and planting within the reserve
  • Tunnel boring design beneath Marmion Avenue and trunk infrastructure including high pressure gas
  • Integration with future Mitchell Freeway design levels
  • EPR/LFI induction modelling adjacent to Western Power’s future 132kV overhead transmission lines
  • Environmental considerations through adjacent conservation areas

Through early-stage engineering and careful coordination, Cossill & Webley resolved complex alignment issues alongside multiple future trunk services – delivering a practical, buildable and efficient design outcome for Water Corporation.