Lead and civil engineering consultant for a 1500 lot project within the Pakenham East PSP. The project involves design of subdivision works including retaining walls, two signalised intersections onto Princes Hwy, upgrading of existing rural roads, design of a temporary sewer pumping station and rising main, 1400m of off-site DN 225/300 sewer, 1500m of water and NDW extensions, Wetland Retarding Basin and Water Supply Booster Pumping Station.
Averley
- Client:Lendlease
- Location:Pakenham East/Nar Nar Goon
- Status:2019-current
- Key Personnel:Ray Todd, David Barry, Kai Lorrimar, Simon Davies, Raf Matta
- Categories:Urban Development, Master Planned Residential
-
Tags:Branch Sewer
Signalised Intersections
Retarding Basins
APA Gas Pipeline Crossings
Wetlands
Constructed Waterway
Major Culvert Crossings
Sewer Pumping Station